
Exciting News!!!!
We now have the first ever trail specific 750mm Batter Bucket, we can now build trail direct to full bench cut with little to no hand work.
Resources.
It takes more than allot of Blood Sweet Tears and Shovels to build a sustainable trail these days so Australian Bush Trails has a long list of resources to make sure everything goes to plan.
The paperwork.
We know to be considered for contracts these days you need plans set in place, we have gone to great lengths to make sure we tick all the boxes with an extensive:
Quality Assurances Plan
Management System Plan
Workplace Health and Safety Plan
Environmental Plan
Risk Management Strategy
BCC Project Environmental Assessment Tool for minor works.
and
Public liability cover of $10,000,000
All tailor made to suit your situation.
The Staff
"Roadie" Rob George

17 years experience in trail design and construction.
18 years Workshop management.
7 years landscaping design and construction.
LS Skid Steer Loader ticket
Construction 30215 Blue Card
Australian Cycling Level 1 Coach
Tim Parker The Super Subbie, what this guy can't operate isn't worth driving.
(also has an eerie effect on photo's)

Toby
Without a doubt the hardest worker of the team, if you need anything from the bottom of the mountain to the top, no matter what the terrain, Toby is your man. (That's the Yanmar C30R not Rob)

Hand Tools for that final trim finish.


And then the bigger stuff
and the not so big stuff


and if we don't have what we need to do the perfect job we'll hire it.